AM1 Projects – Temporary works design

Hedson Rail Quadrant have been engaged by AM1 Projects to support their Wessex framework with temporary works design for the installation of various UTX’s across the network. The Hedson Rail Quadrant JV scope of works was to provide Form 2, Form 3, temporary works design drawings and design risk assessments.

The works were delivered under extremely tight timescales to enable construction works to be carried out in line with the planned access. Hedson Rail Quadrant provided engineering support for design construction interface challenges through construction.

 

Experts in UK rail design and construction